The following technical standards were revised via the SOC Minor Process.

WISCONSIN FIELD OFFICE TECHNICAL GUIDE
450 – 11 – TECHNICAL GUIDE
FOTG NOTICE Wl-94
Purpose. Revisions to Wisconsin Conservation Practice Standards and Specifications

Effective DateThis notice is effective upon receipt.

Explanation of Changes.

Section IV: ConservatioPractice Standards and Specifications:

Field Operations Emissions Reduction (Code 376) – Aligned with national standard to bring Wisconsin standard current.
Open Channel (Code 582) – Additional criteria was added to the standard for conversion of an existing ditch to a two-stage ditch.
Stream Clearing and Snagging (WCS 16) – No changes made. Date was revised to make current.
Wire Mesh Gabions and Mattresses (WCS 17) – No changes made. Date was revised to make current.
Sack or Tubular Gabion (WCS 18) – No changes made. Date was revised to make current.
Soil Bioengineering (WCS 20) – No changes made. Date was revised to make current.
Structural Measures for Stream bank and Shorelines (WCS 21) – No changes made. Date was revised to make current.
Temporary Wave Barrier (Breakwaters) (WCS 22) – No changes made. Date was revised to make current.
Construction Surveys (WCS 24) – Additional wording added to the scope clarifying the work is performed by the contractor or other quality control personnel.
Grouted Rock Riprap (WCS 200) – No changes made. Date was revised to make current.